The Niagara Falls Record

Committee of Adjustment

April 29, 2025

What was decided (8 motions)

8 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.

That the minutes of March 25, 2025 are approved as amended.
Moved by Daniel Moody, seconded by Frank Franze
Carried Unanimously
The application be approved based on the change of the building size from 1520 square metres to 1300 square metres and staff recommendation.
Moved by Paul Campigotto, seconded by Frank Franze
Carried Unanimously
The application be approved based on the staff recommendation.
Moved by Paul Campigotto, seconded by Frank Franze
Carried
The application be approved.
Moved by Paul Campigotto, seconded by Daniel Moody
Carried Unanimously
The application be deferred to the May 20th meeting so applicant can be present and address the application.
Moved by Paul Campigotto, seconded by Frank Franze
Carried
The application be approved based on staff report, and condition one amended from professional plumber or engineer to qualified locate and the second condition stay as it.
Moved by Frank Franze
Carried Unanimously
The application be denied.
Moved by Paul Campigotto, seconded by Daniel Moody
Carried
To approve the change of conditions based on the memorandum provided.
Moved by Daniel Moody, seconded by Frank Franze
Carried

The town’s own record

Read the minutes this page was read from →

Where this page and that document disagree, the document is right and this record is wrong. Say so and it will be corrected.